Moldova TEN-T Road Network Rehabilitation
Sector: Electric Vehicles (EVs) • Location: Moldova
Source: European Bank for Reconstruction and Development (EBRD)
The Moldova TEN-T Road Network Rehabilitation Program aims to modernize 70.9 km of the M3 corridor under Tranche II Project (the Project). The project consists of four lots: The project’s categorization as Category A is triggered by Lot 2, expansion from 2 to 4 lanes, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carrie
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | passed final review, pending approval |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Moldova TEN-T Road Network Rehabilitation Program aims to modernize 70.9 km of the M3 corridor under Tranche II Project (the Project). The project consists of four lots: The project’s categorization as Category A is triggered by Lot 2, expansion from 2 to 4 lanes, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. The project is critical for Moldova’s integration into the EU transport network, improving connectivity, trade, and safety. The M3 Road forms part of the European route E577, which links Moldova to major European transport corridors (Corridors IV and IX), enhancing regional integration and facilitating trade and mobility across borders. 1. Environmental and Social Impact Assessment (“ESIA”), including Environmental and Social Management Plan (“ESMP”) and Annexes in English and Romanian (April 2026); 2. Non-Technical Summary (“NTS”) in English and Romanian (April 2026); 3. Stakeholder Engagement Plan (“SEP”) in English and Romanian (April 2026); 4. Land Acquisition and Resettlement Framework (“LARF”) in English and Romanian (April 2026); 5. Environmental and Social Action Plan (“ESAP”) in English and Romanian (April 2026); 6. Road Safety Audit (“RSA”) in English and Romanian (April 2026). Download ESAP in zip format Download ESIA in zip format Download ESMP in zip format Download LARF in zip format Download NTS in zip format Download RSA in zip format Download SEP in zip format Full ESIA documentation is available locally at: Contact person: Virginia Mandalac Phone: +37322751879 Email: virginia.mandalac@andsa.md National Road Administration J.C. premises Address: Bucuriei 12A Street, Chisinau, MD-2004, Republic of Moldova And EBRD Resident Office: Business Centre, 127, 31 August 1989 Street, MD-2012, Chisinau, Moldova And Website: https://www.andsa.md/consultari-publice-anunturi-si-procese-verbale/anun-privind-publicarea-documenta-iei-de-mediu-i-social-m3/ Environmental or social enquiries Contact person: Virginia Mandalac Phone: +37322751879 Email: virginia.mandalac@andsa.md National Road Administration J.C |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
