MOLENA WALKING TRAIL PROJECT
Sector: Water Supply and Storage • Location: Molena, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project constructs a walking trail in Molena, in Pike County. Construction includes the aesthetic revitalization of a portion of Georgia Highway 109 east of the Georgia Highway 18 intersection. As a part of the project, some of the existing sidewalk and stand-up curb and gutter will need to be demolished. Storm drainage structures, signs, and water meter boxes will need to be temporarily r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project constructs a walking trail in Molena, in Pike County. Construction includes the aesthetic revitalization of a portion of Georgia Highway 109 east of the Georgia Highway 18 intersection. As a part of the project, some of the existing sidewalk and stand-up curb and gutter will need to be demolished. Storm drainage structures, signs, and water meter boxes will need to be temporarily removed and then relocated to facilitate construction. Georgia Highway 109 will be transformed into a new streetscape, which includes 420 square yards of sidewalk with brick pavers, 545 linear feet of 30" stand up curb and gutter, handicap ramps, tapered driveway entrances, pedestrian cross walks, lighting fixtures, tree planters, and decorative storm drain grates, all of which conform to GDOT specifications. The purpose of the project is to enhance the small community while accommodating pedestrian traffic around some of the local downtown businesses. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
