Moller Road Storm Sewer & Pavement Improvement Phase 2
Sector: Water Supply and Storage • Location: Alvin, Texas, United States of America
Source: Dodge USA
This project includes the design of the second of a three phase project to add a storm sewer system, concrete curb and gutter pavement and a sidewalk along Moller Road. This is the fourth of several drainage improvement projects that were recommended in the M1 Ditch Watershed Study that was completed in January 2011 by Dannenbaum Engineering.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project includes the design of the second of a three phase project to add a storm sewer system, concrete curb and gutter pavement and a sidewalk along Moller Road. This is the fourth of several drainage improvement projects that were recommended in the M1 Ditch Watershed Study that was completed in January 2011 by Dannenbaum Engineering. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
