Molson Brewery Expansion

Sector: Cement • Location: Canada

Source: Bird Construction

Molson needed to expand their ageing cellar in order to increase the production at their Edmonton facility. To meet their future demand, Molson installed 9 new ageing tanks. Each tank has a capacity of 1,400 hectolitres (30,800 imperial gallons) and when full, each tank weighed 162,900 kg. This project included the construction of an additional 6,000 square feet onto the existing facility. The pro

Status
Unknown
Sector
Cement, Commercial, Power Generation (CCGT), Tunnel, Manufacturing (Industrial)
Location
Canada
Updated
22 Jul 2026
Source
Bird Construction

ConstructChat

Ask ConstructChat about Molson Brewery Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Molson Brewery Expansion” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Participants

Company

Status

Original status

unknown

Taiyo status

Unknown

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Molson needed to expand their ageing cellar in order to increase the production at their Edmonton facility. To meet their future demand, Molson installed 9 new ageing tanks. Each tank has a capacity of 1,400 hectolitres (30,800 imperial gallons) and when full, each tank weighed 162,900 kg. This project included the construction of an additional 6,000 square feet onto the existing facility. The project included a concrete basement which is refrigerated for the ageing process. A new underground tunnel was installed which connects the new building to the existing building. The main floor has a concrete suspended slab with ring beam penetrations to support the 9 new tanks. These tanks were installed in a vertical direction and due to their size, the tanks had to be installed prior to completion of the building structure. With the tanks installed, a pre-engineered building was installed around these tanks. All of the finishing work including mechanical and electrical had to be completed around the new tanks. This project had a very tight and critical schedule, as work on this facility had to be coordinated with other Molson facilities across the country.

Location

Country

Canada

Source

Source reliability

High

Source

Bird Construction

URL

More Details

Record type

Project

Sector

Cement, Commercial, Power Generation (CCGT), Tunnel, Manufacturing (Industrial)

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project