Molson Brewery Expansion

Sector: Cement • Location: Canada

Source: Bird Construction

Project
Unknown

Molson needed to expand their ageing cellar in order to increase the production at their Edmonton facility. To meet their future demand, Molson installed 9 new ageing tanks. Each tank has a capacity of 1,400 hectolitres (30,800 imperial gallons) and when full, each tank weighed 162,900 kg. This project included the construction of an additional 6,000 square feet onto the existing facility. The pro

Project Information FAQ

Project Information

3 Q
The project “Molson Brewery Expansion” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Molson needed to expand their ageing cellar in order to increase the production at their Edmonton facility. To meet their future demand, Molson installed 9 new ageing tanks. Each tank has a capacity of 1,400 hectolitres (30,800 imperial gallons) and when full, each tank weighed 162,900 kg. This project included the construction of an additional 6,000 square feet onto the existing facility. The project included a concrete basement which is refrigerated for the ageing process. A new underground tunnel was installed which connects the new building to the existing building. The main floor has a concrete suspended slab with ring beam penetrations to support the 9 new tanks. These tanks were installed in a vertical direction and due to their size, the tanks had to be installed prior to completion of the building structure. With the tanks installed, a pre-engineered building was installed around these tanks. All of the finishing work including mechanical and electrical had to be completed around the new tanks. This project had a very tight and critical schedule, as work on this facility had to be coordinated with other Molson facilities across the country.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data