Monarch Mine Safety Closure
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project work will include safeguarding 37 hazardous mine openings. There are 11 vertical openings and 26 adits. Closure methods include polyurethane foam plugs covered with backfill (PUF), steel grate, native rock bulkhead, cable net, and backfill. PROJECT LOCATION The Monarch Project is located in the Middle and North Fork of the South Arkansas River drainages, immediately to the west of Mona
- Status
- Closed
- Sector
- Steel, Telecommunications, Commercial, Metal, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Salida, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Monarch Mine Safety Closure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project work will include safeguarding 37 hazardous mine openings. There are 11 vertical openings and 26 adits. Closure methods include polyurethane foam plugs covered with backfill (PUF), steel grate, native rock bulkhead, cable net, and backfill. PROJECT LOCATION The Monarch Project is located in the Middle and North Fork of the South Arkansas River drainages, immediately to the west of Monarch, Colorado |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Salida |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Telecommunications, Commercial, Metal, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
