logo

Moncton - Lutz, Robinson and Westmorland Street Reconstruction

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

This project involves the installation of a dedicated storm sewer relief system to provide sewer separation on three streets in the City’s downtown core. There are several privately funded projects proposed in this area, but a study done by the City of Moncton’s engineering department has shown that the existing sewer system does not have enough capacity for the additional flows these developments

Status
Under Construction
Sector
Water Supply and Storage, Metal, Road, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Moncton - Lutz, Robinson and Westmorland Street Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Moncton - Lutz, Robinson and Westmorland Street Reconstruction” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the installation of a dedicated storm sewer relief system to provide sewer separation on three streets in the City’s downtown core. There are several privately funded projects proposed in this area, but a study done by the City of Moncton’s engineering department has shown that the existing sewer system does not have enough capacity for the additional flows these developments would generate. The scope of the project includes new storm sewer extensions that would connect to an existing storm sewer system (built in 2007), as well as replacing an existing combined sewer with a dedicated sanitary sewer. In addition, the existing water distribution system which is made of cast iron pipe will be replaced. The streets will be fully reconstructed following the renewal of the underground infrastructure, and the existing aerial lines (communication and electricity) will be relocated underground, which will improve reliability during ice storm events. Additionally, Westmorland Street will be surcharged and raised to offset the rising sea levels, along with upgrading the surface treatment. The project aims to increase the City’s capacity to manage wastewater and stormwater, increase access to potable water, improve capacity and quality of pathways and active transportation infrastructure, and increase structural capacity to adapt to climate change and extreme weather events.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Road, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project