Moncton - Lutz, Robinson and Westmorland Street Reconstruction
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project involves the installation of a dedicated storm sewer relief system to provide sewer separation on three streets in the City’s downtown core. There are several privately funded projects proposed in this area, but a study done by the City of Moncton’s engineering department has shown that the existing sewer system does not have enough capacity for the additional flows these developments
- Status
- Under Construction
- Sector
- Water Supply and Storage, Metal, Road, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Moncton - Lutz, Robinson and Westmorland Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the installation of a dedicated storm sewer relief system to provide sewer separation on three streets in the City’s downtown core. There are several privately funded projects proposed in this area, but a study done by the City of Moncton’s engineering department has shown that the existing sewer system does not have enough capacity for the additional flows these developments would generate. The scope of the project includes new storm sewer extensions that would connect to an existing storm sewer system (built in 2007), as well as replacing an existing combined sewer with a dedicated sanitary sewer. In addition, the existing water distribution system which is made of cast iron pipe will be replaced. The streets will be fully reconstructed following the renewal of the underground infrastructure, and the existing aerial lines (communication and electricity) will be relocated underground, which will improve reliability during ice storm events. Additionally, Westmorland Street will be surcharged and raised to offset the rising sea levels, along with upgrading the surface treatment. The project aims to increase the City’s capacity to manage wastewater and stormwater, increase access to potable water, improve capacity and quality of pathways and active transportation infrastructure, and increase structural capacity to adapt to climate change and extreme weather events. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Road, Power Generation (CCGT), Waste Processing and Treatment, Steel, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
