Mong Duong 1 Thermal Power Project - Project 1
Sector: Water Supply and Storage • Location: Vietnam
Source: Asian Development Bank (ADB)
The main objective of the proposed project is to expand the generating capacity of Electricity of Viet Nam (EVN) in order to help mitigate shortage of power in Northern Viet Nam and to support industrial and economic growth. The Project provides for the construction of four units of 250 MW circulatory fluidized bed (CFB) generating units and the common facilities for another 1,000 MW to 1,200 MW i
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main objective of the proposed project is to expand the generating capacity of Electricity of Viet Nam (EVN) in order to help mitigate shortage of power in Northern Viet Nam and to support industrial and economic growth. The Project provides for the construction of four units of 250 MW circulatory fluidized bed (CFB) generating units and the common facilities for another 1,000 MW to 1,200 MW installed generating capacity utilizing domestic coal as fuel. This constitutes as Phase 1 of the first stage development program envisaged to establish in two phases and increase the generating capacity of this new power station to 2,200 MW. The 2,000 MW Mong Duong Thermal Power Project will a mine mouth based power plant.The Project will include all works and equipment required for the development of 250 MW x 4 units of CFB generating units. The Project will consist of the following components:(a) civil works for site preparation and common works, namely:(b) foundations, the power station building and cooling water circulation and other systems;(c) 250 MW x 4 CFB coal-fired CFB boiler complete with all auxiliaries;(d) two reheat steam turbine generators each with a rated capacity of 500 MW, complete with auxiliaries;(e) instrumentation and control systems;(f) coal and ash handling systems;(g) water treatment and other miscellaneous mechanical plants;(h) transformers, switchyeard equipment and other miscellaneous electricial equipment; and(i) consulting services |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
