Mong Duong II Thermal Power Generation Project

Sector: Commercial • Location: Quang Ninh, Vietnam

Source: World Bank Group

Project
Active

The Mong Duong II Thermal Power Generation Project is a 1,200 MW coal-fired plant located in Quang Ninh Province, Vietnam. In 2010, the project company Mong Duong AES-TKV was granted a 25-year Build, Operate, Transfer (BOT) concession, with the end of construction as the start date of the 25-year contract. AES, with 51% equity, holds a majority stake in the project company. PSC Energy Global Co

Project Information FAQ

Project Information

5 Q
The project “Mong Duong II Thermal Power Generation Project” is an infrastructure initiative in the Commercial sector, located in Quang Ninh, Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mong Duong II Thermal Power Generation Project is a 1,200 MW coal-fired plant located in Quang Ninh Province, Vietnam. In 2010, the project company Mong Duong AES-TKV was granted a 25-year Build, Operate, Transfer (BOT) concession, with the end of construction as the start date of the 25-year contract. AES, with 51% equity, holds a majority stake in the project company. PSC Energy Global Company, a wholly-owned subsidiary of POSCO Power Corp owns 30%, and the Stable Investment Corporation, a subsidiary of China Investment Corporation owns 19%. In January 2013, construction was reported as 2/3rds completed. The project company agreed to sell power to the state-owned Electricite Vietnam (EVN) under a 25-year Power Purchase Agreement (PPA). The PPA was U.S. dollar denominated and allows for a fuel cost pass through, protecting the project from coal price fluctuations. The company also signed a 25-year coal supply agreement with the state-owned Vietnam National Coal-Mineral Industries Group (Vinacomin - TKV). Engineering, Procurement, and Construction (EPC) contract was awarded to Doosan Heavy Industries and Construction Co. Ltd. of South Korea. Construction started in August 2011, and commercial operations were expected to commence in June 2015. Total project cost was estimated at US$ 1.95 billion. Financial close occurred on 24th August 2011. The 12 lenders were foreign banks BNP Paribas, Credit Agricole, HSBC, ING, Natixis, Societe Generale, Sumitomo Mitsui Banking Corp., Mizuho Corporate Bank, Standard Chartered, UniCredit, Credit Industriel et Commercial and DZ Bank. Korea Eximbank, the biggest single provider of direct debt, and Korea Trade Insurance Corporation (K-sure) will provide extended political risk cover. The project was the first opportunity for South Korean ECAs to participate in Vietnam.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data