Mongolia NZE RE
Pending · Mongolia
Source: IFC Project Disclosures
The proposed IFC investment is an A loan to support the Bilgeh Wind Farm (the “Project”), a 150 MW utility-scale wind power facility. The greenfield project includes a 50 MW / 100 MWh Battery Energy Storage System (BESS) and an associated ~65 km 220 kV overhead transmission line (OHL). The Project is located in the Tsogttsetsii soum of the Umnugovi (South Gobi) region of Mongolia and is being deve
- Status
- Prospective
- Sector
- Road, Power Generation (CCGT), Energy Storage, Cement, Wind, Metal, Commercial, Solar, Fertilizers, Power Transmission, Raw Materials
- Location
- Mongolia
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Mongolia NZE RE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment is an A loan to support the Bilgeh Wind Farm (the “Project”), a 150 MW utility-scale wind power facility. The greenfield project includes a 50 MW / 100 MWh Battery Energy Storage System (BESS) and an associated ~65 km 220 kV overhead transmission line (OHL). The Project is located in the Tsogttsetsii soum of the Umnugovi (South Gobi) region of Mongolia and is being developed by Net Zero Energy LLC (NZE or the “Company”), a special purpose vehicle that is currently 90% owned by MCS Mongolia LLC (MCSM) (with the expectation that its shares will be fully or partially transferred to MCS Energy Holding LLC (MCSE)) and 10% owned by Ureca LLC (Ureca), a local clean technology company. The Project will supply off-grid, captive power to the Oyu Tolgoi (OT) copper-gold mine under a 20-year corporate power purchase agreement (PPA).The Project is currently in the pre-construction phase. Early works, focusing on site preparation for ancillary facilities, are scheduled to begin on November 15, 2026 under a Limited Notice to Proceed. Main construction will commence in March 2027 and will last for approximately 17 months, targeting commercial operations in Q1 2029. The Project lease covers a 20,438-hectare area, while the total project footprint totals approximately 130.53 hectares. The temporary construction areas will comprise progressive crane pads and turbine laydown areas, temporary storage, concrete batching, a temporary solar PV and BESS for construction power, and a workers' accommodation camp sized for a peak workforce of 250–300 personnel. The permanent physical footprint includes approximately one hectare for the foundations of 24 Envision Energy ‘EN 6.25-182’ wind turbine generators (WTGs), a 5-hectare fenced area for the 220/35 kV substation and co-located 100 MWh containerized Lithium Iron Phosphate BESS, and footprint alterations from 56.1 km of unpaved internal roads and a ~29.1 km unpaved external access road (where physical clearing starts in December 2026). Power transmission to OT will be provided via a ~65 km 220 kV double-circuit overhead line (OHL) supported by 228 towers. Operations will employ approximately 34 staff, with EPC and O&M oversight managed jointly by MCS International and Envision Energy.The Project is located in the South Gobi region of Mongolia, approximately 60 km from the Oyu Tolgoi mine and 130 km north of the international border with China. The site is characterized by a high plateau of open desert steppe, which is sparsely populated by nomadic herding communities who use the area for livestock grazing. The nearest permanent settlement is the Tsogttsetsii soum center. The Project site itself is located 26.4 km from the Galba Gobi Key Biodiversity Area (KBA) and 36.3 km from the Small Gobi A Strictly Protected Area. The ~65 km OHL route traverses one locally protected area (Gurvan Gavluud, Har Deliin Tolgod and Ih Baga Luus) for approximately 12.2 km. This area already contains existing infrastructure, and national regulations permit the construction of linear infrastructure like transmission lines within its boundaries.Further, IFC is considering to finance other solar, wind and BESS projects to be built and operated by SPVs to be set by MCS Energy Holding (MCSE). |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Location
Country | Mongolia |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Energy Storage, Cement, Wind, Metal, Commercial, Solar, Fertilizers, Power Transmission, Raw Materials |
Article published date | 2026-11-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mongolia
- FIF - CA YiB - Transcapital Youth in Business loan II
- Mandalgovi (Dundgovi) - Dalanzadgad (Omnogovi) Road Project
- Tavan Tolgoi-Gashuun Sukhait Rail Line, Omnogovi
- Gobi region railway line parallel road
- Western Regional Road Corridor Development Program - Tranche I
- Sainshand Wind Farm
- Regional Road Development Project
- Ulaanbaatar-Khoshig Valley Airport (NUBIA) Highway Project