Mongolia NZE RE

Pending · Mongolia

Source: IFC Project Disclosures

The proposed IFC investment is an A loan to support the Bilgeh Wind Farm (the “Project”), a 150 MW utility-scale wind power facility. The greenfield project includes a 50 MW / 100 MWh Battery Energy Storage System (BESS) and an associated ~65 km 220 kV overhead transmission line (OHL). The Project is located in the Tsogttsetsii soum of the Umnugovi (South Gobi) region of Mongolia and is being deve

Status
Prospective
Sector
Road, Power Generation (CCGT), Energy Storage, Cement, Wind, Metal, Commercial, Solar, Fertilizers, Power Transmission, Raw Materials
Location
Mongolia
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Mongolia NZE RE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Mongolia NZE RE” is an infrastructure initiative in the Road sector, located in Mongolia. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed IFC investment is an A loan to support the Bilgeh Wind Farm (the “Project”), a 150 MW utility-scale wind power facility. The greenfield project includes a 50 MW / 100 MWh Battery Energy Storage System (BESS) and an associated ~65 km 220 kV overhead transmission line (OHL). The Project is located in the Tsogttsetsii soum of the Umnugovi (South Gobi) region of Mongolia and is being developed by Net Zero Energy LLC (NZE or the “Company”), a special purpose vehicle that is currently 90% owned by MCS Mongolia LLC (MCSM) (with the expectation that its shares will be fully or partially transferred to MCS Energy Holding LLC (MCSE)) and 10% owned by Ureca LLC (Ureca), a local clean technology company. The Project will supply off-grid, captive power to the Oyu Tolgoi (OT) copper-gold mine under a 20-year corporate power purchase agreement (PPA).The Project is currently in the pre-construction phase. Early works, focusing on site preparation for ancillary facilities, are scheduled to begin on November 15, 2026 under a Limited Notice to Proceed. Main construction will commence in March 2027 and will last for approximately 17 months, targeting commercial operations in Q1 2029. The Project lease covers a 20,438-hectare area, while the total project footprint totals approximately 130.53 hectares. The temporary construction areas will comprise progressive crane pads and turbine laydown areas, temporary storage, concrete batching, a temporary solar PV and BESS for construction power, and a workers' accommodation camp sized for a peak workforce of 250–300 personnel. The permanent physical footprint includes approximately one hectare for the foundations of 24 Envision Energy ‘EN 6.25-182’ wind turbine generators (WTGs), a 5-hectare fenced area for the 220/35 kV substation and co-located 100 MWh containerized Lithium Iron Phosphate BESS, and footprint alterations from 56.1 km of unpaved internal roads and a ~29.1 km unpaved external access road (where physical clearing starts in December 2026). Power transmission to OT will be provided via a ~65 km 220 kV double-circuit overhead line (OHL) supported by 228 towers. Operations will employ approximately 34 staff, with EPC and O&M oversight managed jointly by MCS International and Envision Energy.The Project is located in the South Gobi region of Mongolia, approximately 60 km from the Oyu Tolgoi mine and 130 km north of the international border with China. The site is characterized by a high plateau of open desert steppe, which is sparsely populated by nomadic herding communities who use the area for livestock grazing. The nearest permanent settlement is the Tsogttsetsii soum center. The Project site itself is located 26.4 km from the Galba Gobi Key Biodiversity Area (KBA) and 36.3 km from the Small Gobi A Strictly Protected Area. The ~65 km OHL route traverses one locally protected area (Gurvan Gavluud, Har Deliin Tolgod and Ih Baga Luus) for approximately 12.2 km. This area already contains existing infrastructure, and national regulations permit the construction of linear infrastructure like transmission lines within its boundaries.Further, IFC is considering to finance other solar, wind and BESS projects to be built and operated by SPVs to be set by MCS Energy Holding (MCSE).

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

Mongolia

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Energy Storage, Cement, Wind, Metal, Commercial, Solar, Fertilizers, Power Transmission, Raw Materials

Article published date

2026-11-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project