logo

Monitoring System of rock stability in mines based on Advanced 4D seismic analysis.

Location: Italy

Source: EU Funding & Tenders Portal

Project
Ended

PROBLEM Catastrophic ground collapse in mines is the main hazard for safety of workers and for the mining activity. Monitoring the alteration of the state of the rock mass during underground mining operations plays a key-role to forecast the failure of the rocks. This is currently done through 3D LET (Local Earthquake Tomography) computational analysis on data provided by existing seismographic ne

Status
Closed
Location
Italy
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Monitoring System of rock stability in mines based on Advanced 4D seismic analysis.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Monitoring System of rock stability in mines based on Advanced 4D seismic analysis.” is an infrastructure initiative, located in Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PROBLEM Catastrophic ground collapse in mines is the main hazard for safety of workers and for the mining activity. Monitoring the alteration of the state of the rock mass during underground mining operations plays a key-role to forecast the failure of the rocks. This is currently done through 3D LET (Local Earthquake Tomography) computational analysis on data provided by existing seismographic networks once every month and through quasi-manual analysis of experts: the procedure is time-consuming and expensive, and the results are difficult to be interpreted by the mine’s decision makers and not fully reliable (high possibility of error). SOLUTION: MINES-IN-TIME Mines-In-Time (MIT) is an automatic solution for monitoring in real time the stress alteration of the rock mass during mining operations, to be integrated in a traffic-light Decision Support System (DSS) to avoid risks and cost related to mines collapse. The system is based on the innovative 4D LET algorithm (three spatial dimensions + time), able to analyze both natural and induced micro-seismicity such as movements due to drilling or other mining operations. The solution was validated in relevant environment thanks to its application in Garpenberg mine (owned by Boliden Group - Sweden), the world's most productive and automated underground zinc mine (1250 m depth), demonstrating outstanding monitoring capability, reliability and low cost (no hardware needed).

Location

Country

Italy

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Article published date

2026-02-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project