Monjolinho Hydro Power Plant
Sector: Hydro • Location: Brazil
Source: World Bank Group
In December 2001, the Brazilian company Desenvix was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 74-MW hydro power plant located in the Passo Fundo River, state of Rio Grande do Sul. No information was available on the other bidders.
The bidding criteria set by the federal regulatory agency ANEEL was the
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Monjolinho Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2001, the Brazilian company Desenvix was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 74-MW hydro power plant located in the Passo Fundo River, state of Rio Grande do Sul. No information was available on the other bidders. The bidding criteria set by the federal regulatory agency ANEEL was the highest payment to the government for the concession rights. The company agreed to pay US$ 1.3 million (BRL 2.4 million) in yearly installments during the life of the contract, starting once operations commence (using a discount rate of 10%, the present value of this contribution was estimated at US$ 11.9 million). The contract was signed in April 2002, and sponsors created the company Monel Monjolinho Energetica to lead the project during the 35-year contract period. All the electricity produced was set to be sold to distribution companies. The sponsor committed to invest US$ 153.6 million (BRL 281 million) in the power plant. Financial closure was achieved in January 2008, when the sponsor was granted a US$ 92.1 million (BRL 168.5 million) loan from BNDES. The remaining cost was financed with the sponsors’ internal resources. Construction works started in Junho 2007, and operations commenced in September 2009. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.