logo
ProjectPlanned

Monkey Island LNG Export Facility

The owner, status and timeline of this project. A free account opens every field.

Source: Offshore Engineer Magazine

Monkey Island LNG has awarded McDermott a master services agreement to provide front-end engineering and planning services for a planned $25 billion liquefied natural gas export facility in Cameron Parish, Louisiana. Phase 1 includes three trains with a combined capacity of 15.6 million tonnes per annum, with plans to expand to five trains totaling 26 million tonnes per annum. The project uses Con

Status
Prospective
Sector
LNG, Rail, Natural Gas
Location
Louisiana, United States of America
Updated
22 Jul 2026
Source
Offshore Engineer Magazine

ConstructChat

Ask ConstructChat about Monkey Island LNG Export Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Monkey Island LNG Export Facility” is an infrastructure initiative in the LNG sector, located in Louisiana, United States. Taiyo aggregates data on it from Offshore Engineer Magazine.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Monkey Island LNG has awarded McDermott a master services agreement to provide front-end engineering and planning services for a planned $25 billion liquefied natural gas export facility in Cameron Parish, Louisiana. Phase 1 includes three trains with a combined capacity of 15.6 million tonnes per annum, with plans to expand to five trains totaling 26 million tonnes per annum. The project uses ConocoPhillips Optimized Cascade Process and McDermott's modular LNG train design to maximize production efficiency and reduce site footprint.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Louisiana

Source

Source

Offshore Engineer Magazine

URL

More Details

Record type

Project

Sector

LNG, Rail, Natural Gas

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project