Monkey Island LNG Terminal, Louisiana

Sector: LNG • Location: United States

Source: Hydrocarbon Technology

Project
Closed

Monkey Island LNG is a proposed liquefied natural gas (LNG) export terminal to be developed by Monkey Island LNG (formerly SCT&E LNG) on Monkey Island in Cameron Parish, Louisiana, US. Southern California Telephone Company is the parent company of Monkey Island LNG, which has been established to develop the LNG facility and export terminal. Approval to export LNG from the terminal was granted by

Project Information FAQ

Project Information

5 Q
The project “Monkey Island LNG Terminal, Louisiana” is an infrastructure initiative in the LNG sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Monkey Island LNG is a proposed liquefied natural gas (LNG) export terminal to be developed by Monkey Island LNG (formerly SCT&E LNG) on Monkey Island in Cameron Parish, Louisiana, US. Southern California Telephone Company is the parent company of Monkey Island LNG, which has been established to develop the LNG facility and export terminal. Approval to export LNG from the terminal was granted by the Department of Energy in December 2015. A 30-year authorisation has been awarded to export 2.1 billion cubic feet a day (bcf/d) of natural gas or approximately 15.75 million tonnes a year (Mtpa) by ship from the proposed project destination. The export permission has been given to ship to countries with which the US has a free trade agreement (FTA) and does not prohibit trade. Monkey Island LNG has also entered a 20-year fixed price binding agreement to receive natural gas for the new facility. Final investment decision on the $6.9bn terminal, which will have a LNG capacity of 15.75Mtpa, is expected to be taken in Q4 2020, while operations are expected to begin in 2022. The LNG facility and the export terminal will be constructed on a 246-acre site on Monkey Island on Louisiana’s Calcasieu Ship Channel. The site is situated 2.5 miles (4km) from the Gulf of Mexico and lies close to the US natural gas intrastate and interstate pipeline systems, as well as significant gas pipeline interconnections. A state-of-the-art LNG shipping facility can be developed at the site to host deep draft and mega LNG carriers. The site also provides access to aide channels, which are important for small-scale LNG operations and bunkering activities. The site has been selected for its close proximity to the Gulf of Mexico that makes it an ideal destination to export LNG to FTA nations such as Costa Rica and Mexico. Domestically produced LNG can also be easily exported to other countries such as Japan and China, through the Panama Canal and to the European markets. It is planned that the project will liquefy approximately 1.6bcf/d of natural gas to enable the production of 12Mtpa of LNG using three LNG trains. The LNG facility will include necessary utilities, storage and marine facilities. The identical natural gas liquefaction trains will each have a capacity of 4Mtpa and use cryogenic technology for liquefying the natural gas. The natural gas will be supplied to the project by pipelines to be treated at the gas treatment area and the treated gas will be stored on-site as LNG. LNG carriers moored at the project site will be used for transporting LNG to domestic and export markets after it is loaded into them from the storage tanks. The operator will export the LNG produced via take-or-pay tolling agreements and has entered off-take agreements to facilitate the delivery of LNG to customers. A total of four agreements have been signed for the sale of a total of 4.7Mtpa of LNG, which constitutes a third of the total LNG produced by the project. The operator has also signed a multibillion-dollar agreement with Chinese LNG terminal owner JOVO Group for long-term off-take of LNG from the project, along with a potential equity investment in the project by JOVO Group. A master service agreement has been awarded to Technip that will cover engineering services that are necessary to develop the project, as well as front-end engineering design. Technip will also assist the operator during the Federal Energy Regulatory Commission’s (FERC) approval process. AECOM was selected to coordinate the environmental analysis and engineering services for the FERC pre-Filing review process and application in July 2017. AECOM earlier completed the phase one environmental study for the project site. Air Products has been selected to provide their propane pre-cooled mixed refrigerant process and main cryogenic heat exchangers technology, equipment, and the related process license. The project’s marine infrastructure will be assessed by Proes, which will prepare a waterway suitability assessment that will be submitted to the US Coast Guard.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data