Monroe Street Pool Replacement
Sector: Water Supply and Storage • Location: Carlsbad, California, United States of America
Source: Dodge USA
Selective demolition of existing administration building, pool, hardscape, solar water heating system and all subgrade utility infrastructure; 2. removal or salvage of mechanical, piping and electrical systems; 3. site expansion to accommodate design shown for larger facility (including site grading, clearing of existing vegetation, hardscape); 4. shoring, excavation, dewatering (if necessary), tr
- Status
- Under Construction
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Power Transmission, Road, Solar, Government, Consumer Products
- Location
- Carlsbad, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Monroe Street Pool Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Selective demolition of existing administration building, pool, hardscape, solar water heating system and all subgrade utility infrastructure; 2. removal or salvage of mechanical, piping and electrical systems; 3. site expansion to accommodate design shown for larger facility (including site grading, clearing of existing vegetation, hardscape); 4. shoring, excavation, dewatering (if necessary), trenching; 5. new subgrade utility infrastructure; 6. construction of new structures, including new... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carlsbad |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Power Transmission, Road, Solar, Government, Consumer Products |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
