Monroe WTP Impr: Chemical Feed Line Replacement
Sector: Water Supply and Storage • Location: Bloomington, Indiana, United States of America
Source: Dodge
General construction of improvements to the water treatment facility including replacement of chemical feed skids and day tanks, chemical feed lines throughout the facility, underground yard piping and pipe chase for the chemical feed lines, addition of a second backwash pump, rehabilitation of the Backwash Holding Basin, and ancillary site, structural, electrical, and instrumentation and control
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Commercial, Manufacturing (Industrial), Power Generation (CCGT), Government
- Location
- Bloomington, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Monroe WTP Impr: Chemical Feed Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General construction of improvements to the water treatment facility including replacement of chemical feed skids and day tanks, chemical feed lines throughout the facility, underground yard piping and pipe chase for the chemical feed lines, addition of a second backwash pump, rehabilitation of the Backwash Holding Basin, and ancillary site, structural, electrical, and instrumentation and control improvements to facilitate the implementation of the improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Bloomington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Commercial, Manufacturing (Industrial), Power Generation (CCGT), Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
