logo

Monsanto Data Center J Building

Sector: Commercial • Location: St. Louis, Missouri, United States

Source: McCarthy Building Companies

Project
Completed

Built at Monsanto’s world headquarters, the new data center replaced a sprawling server farm previously occupying two floors in one of the company’s office buildings since the mid-1970s. The new data center was needed to house the immense computing network that supports Monsanto’s worldwide operations. This two-story, 40,000-square-foot facility was built to an N+1 standard, providing redundancies

Project Information FAQ

Project Information

4 Q
The project “Monsanto Data Center J Building” is an infrastructure initiative in the Commercial sector, located in St. Louis, Missouri, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Built at Monsanto’s world headquarters, the new data center replaced a sprawling server farm previously occupying two floors in one of the company’s office buildings since the mid-1970s. The new data center was needed to house the immense computing network that supports Monsanto’s worldwide operations. This two-story, 40,000-square-foot facility was built to an N+1 standard, providing redundancies in the systems to ensure uninterrupted power to all components in the event of a failure. State-of-the-art characteristics include stringent environmental controls, utility infrastructure, and advanced security standards to support ongoing operations. The data center was the first LEED registered data center in the state of Missouri and the third LEED certified data center in the country. The center is designed with a 17-foot floor-to-ceiling span to promote airflow and eliminate the need for power or cooling units on the data center’s floor. A spanning glass wall encompasses the east face of the building, constructed with polymer interlayer and tempered glass, capable of withstanding 200 mph wind with 90 mph object impacts winds or an earthquake measuring 5.0 on the Richter scale. The fitted glass front runs the entire length of the east side of the building and extends out from two to six feet. It provides 60 percent sun shading, lowering the demands on the building’s cooling systems. Monsanto’s new data center represents the consolidation of 10 geographically dispersed data centers into one hub, which is expected to save the St. Louis-based agricultural giant 27 percent of the energy consumed by a conventionally designed data center.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data