Monsanto Data Center J Building
Sector: Commercial • Location: St. Louis, Missouri, United States
Source: McCarthy Building Companies
Built at Monsanto’s world headquarters, the new data center replaced a sprawling server farm previously occupying two floors in one of the company’s office buildings since the mid-1970s. The new data center was needed to house the immense computing network that supports Monsanto’s worldwide operations. This two-story, 40,000-square-foot facility was built to an N+1 standard, providing redundancies
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Built at Monsanto’s world headquarters, the new data center replaced a sprawling server farm previously occupying two floors in one of the company’s office buildings since the mid-1970s. The new data center was needed to house the immense computing network that supports Monsanto’s worldwide operations. This two-story, 40,000-square-foot facility was built to an N+1 standard, providing redundancies in the systems to ensure uninterrupted power to all components in the event of a failure. State-of-the-art characteristics include stringent environmental controls, utility infrastructure, and advanced security standards to support ongoing operations. The data center was the first LEED registered data center in the state of Missouri and the third LEED certified data center in the country. The center is designed with a 17-foot floor-to-ceiling span to promote airflow and eliminate the need for power or cooling units on the data center’s floor. A spanning glass wall encompasses the east face of the building, constructed with polymer interlayer and tempered glass, capable of withstanding 200 mph wind with 90 mph object impacts winds or an earthquake measuring 5.0 on the Richter scale. The fitted glass front runs the entire length of the east side of the building and extends out from two to six feet. It provides 60 percent sun shading, lowering the demands on the building’s cooling systems. Monsanto’s new data center represents the consolidation of 10 geographically dispersed data centers into one hub, which is expected to save the St. Louis-based agricultural giant 27 percent of the energy consumed by a conventionally designed data center. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Medical and Research Translation (MART) Building, Stony Brook University
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Virginia Cancer Specialists (VCS) Research Facility, Virginia
- Bristol-Myers Squibb Manufacturing Plant, Devens, Massachusetts
- Cambridge Major Laboratories Active Pharmaceutical
