Monte Vista - Downtown Alleyway Infrastructure Improvements
Sector: Water Supply and Storage • Location: Monte Vista, Colorado, United States of America
Source: Dodge
The overall project includes, but is not limited to, the following: replacement of sanitary sewer and waterline utilities, installation of new storm drainage infrastructure, and resurfacing of both alleys with hot mix asphalt. Work will be performed in City of Monte Vista Right-of-Ways and Colorado State Highway 160 Right-of-Way in two alleyways between Washington St and Adams St, and Adams St and
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Government
- Location
- Monte Vista, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Monte Vista - Downtown Alleyway Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall project includes, but is not limited to, the following: replacement of sanitary sewer and waterline utilities, installation of new storm drainage infrastructure, and resurfacing of both alleys with hot mix asphalt. Work will be performed in City of Monte Vista Right-of-Ways and Colorado State Highway 160 Right-of-Way in two alleyways between Washington St and Adams St, and Adams St and Jefferson St Construction and engineering services for the City s Downtown Alleyway Infrastructu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Monte Vista |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
