logo
ProjectUnder Construction

Montego Bay Perimeter Road Project

Under construction · St James · Last reported May 2025

Source: Jamaica Gleaner

The Montego Bay Perimeter Road Project aims to alleviate traffic congestion in Montego Bay while minimizing the impact on local residents. A recent design review has reduced the number of affected properties from 18 to just three homes and portions of 15 lots, with ongoing communication and compensation efforts for those impacted.

Status
Under Construction
Sector
Road
Location
Montego Bay, St James, Jamaica
Updated
22 Jul 2026
Source
Jamaica Gleaner

ConstructChat

Ask ConstructChat about Montego Bay Perimeter Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Montego Bay Perimeter Road Project” is an infrastructure initiative in the Road sector, located in Montego Bay, St James, Jamaica. Taiyo aggregates data on it from Jamaica Gleaner.

Participants

Company

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Montego Bay Perimeter Road Project aims to alleviate traffic congestion in Montego Bay while minimizing the impact on local residents. A recent design review has reduced the number of affected properties from 18 to just three homes and portions of 15 lots, with ongoing communication and compensation efforts for those impacted.

Location

Country

Jamaica

State

St James

City

Montego Bay

Source

Source

Jamaica Gleaner

URL

More Details

Record type

Project

Sector

Road

Article published date

2025-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project