Montenegro's EPCG BESS Project
Sector: Power Generation (CCGT) • Location: Montenegro
Source: See News
Montenegrin state-owned power utility Elektroprivreda Crne Gore (EPCG) has initiated the first stage of a project to prepare a feasibility study and project design for battery energy storage systems (BESS) with a total capacity of 240-300 MWh. The project aims to enhance energy storage capabilities across multiple locations in Montenegro.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Energy Storage
- Location
- Montenegro
- Updated
- 22 Jul 2026
- Source
- See News
ConstructChat
Ask ConstructChat about Montenegro's EPCG BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Montenegrin state-owned power utility Elektroprivreda Crne Gore (EPCG) has initiated the first stage of a project to prepare a feasibility study and project design for battery energy storage systems (BESS) with a total capacity of 240-300 MWh. The project aims to enhance energy storage capabilities across multiple locations in Montenegro. |
Original sector | Energy |
Location
Country | Montenegro |
Source
Source | See News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Energy Storage |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
