Montgomery Center Mixed Use Redevelopment - Garage
Sector: Car parking • Location: Alexandria, Virginia, United States of America
Source: Dodge
Project consists of a 408,000-square-foot development with 327 apartment units, 25,273 square feet of retail, two floors of below-grade parking with 406 spaces - 13,000-square-foot arts space.
- Status
- Closed
- Sector
- Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive, Consumer Products, Steel
- Location
- Alexandria, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Montgomery Center Mixed Use Redevelopment - Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of a 408,000-square-foot development with 327 apartment units, 25,273 square feet of retail, two floors of below-grade parking with 406 spaces - 13,000-square-foot arts space. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Alexandria |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive, Consumer Products, Steel |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
