Montgomery Locks & Dam New River Chamber
Sector: Water Supply and Storage • Location: Monaca, Pennsylvania, United States of America
Source: Dodge USA
The Base Contract consists of completion of a new Lock Chamber. Specific features of work under the base contract include, but are not limited to the following: a. Pre-excavate as needed for construction. b. Install temporary service bridge. c. Disconnect dam side power while maintaining lock power. d. Intall flashboards. e. Construction the in water combination wall. f. Demolition Upper and Lower
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Bridge, Commercial, Manufacturing (Industrial)
- Location
- Monaca, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Montgomery Locks & Dam New River Chamber
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Base Contract consists of completion of a new Lock Chamber. Specific features of work under the base contract include, but are not limited to the following: a. Pre-excavate as needed for construction. b. Install temporary service bridge. c. Disconnect dam side power while maintaining lock power. d. Intall flashboards. e. Construction the in water combination wall. f. Demolition Upper and Lower Guard walls. g. Construct foundation drilled shafts, and in the wet monoliths. Construction of m... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Monaca |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Bridge, Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
