Montgomery Locks and Dam Hydroelectric Project
Sector: Wind • Location: Beaver, Pennsylvania, United States of America
Source: Dodge USA
The proposed Montgomery Locks and Dam Hydroelectric Project would be located at RM 31.7 and consist of the following new facilities: (1) a 340-foot-long, 205-foot-wide intake channel containing a 150-foot-long, 90-foot-high, 205-foot-wide intake structure with 5-inch bar spacing trashracks; (2) a 315-foot-long, 105-foot-high, 205-foot-wide reinforced concrete powerhouse on the north bank of the ri
- Status
- Prospective
- Sector
- Wind, Cement, Hydro, Commercial, Water Supply and Storage
- Location
- Beaver, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Montgomery Locks and Dam Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Montgomery Locks and Dam Hydroelectric Project would be located at RM 31.7 and consist of the following new facilities: (1) a 340-foot-long, 205-foot-wide intake channel containing a 150-foot-long, 90-foot-high, 205-foot-wide intake structure with 5-inch bar spacing trashracks; (2) a 315-foot-long, 105-foot-high, 205-foot-wide reinforced concrete powerhouse on the north bank of the river; (3) three turbine-generator units with a combined capacity of 42 MW; (4) a 280-foot-long, 21... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Beaver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Cement, Hydro, Commercial, Water Supply and Storage |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
