Montgomery Span Bridge Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Work involves the removal of an existing single span concrete slab bridge and the construction of a single span bridge. The proposed single span structure consists of 17" deep PPC deck beams, 3' wide and 40'-3" in length, with a 45 degree skew. The structure is 42'-3" back-to-back of abutments with a deck width of 27'-0" out to out. The work also includes a total of approx. 500' of approach roadwa
- Status
- Closed
- Sector
- Cement, Government, Road, Bridge, Commercial
- Location
- Schram City, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Montgomery Span Bridge Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work involves the removal of an existing single span concrete slab bridge and the construction of a single span bridge. The proposed single span structure consists of 17" deep PPC deck beams, 3' wide and 40'-3" in length, with a 45 degree skew. The structure is 42'-3" back-to-back of abutments with a deck width of 27'-0" out to out. The work also includes a total of approx. 500' of approach roadway. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Schram City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Road, Bridge, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
