logo
ProjectBidding

Montrose Boulevad - Segment 1 Improvements

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge

The project involves fully reconstructing Montrose Blvd from Allen Parkway to W Clay Street. There will be 10 x10 reinforced concrete boxes for 5 ac-ft of inline detention, four lanes of concrete pavement, ADA-compliant 4 to 8-foot-wide sidewalks and ramps, BOOST bus stops, a ped and bike bridge with a decorative metal cladding system over the Allen Parkway underpass, existing bridge modifications

Status
Prospective
Sector
Water Supply and Storage, Metal, Government, Cement, Tunnel, Road, Commercial, Waste Processing and Treatment, Car parking, Bridge, Automotive
Location
Houston, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Montrose Boulevad - Segment 1 Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Montrose Boulevad - Segment 1 Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Houston, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves fully reconstructing Montrose Blvd from Allen Parkway to W Clay Street. There will be 10 x10 reinforced concrete boxes for 5 ac-ft of inline detention, four lanes of concrete pavement, ADA-compliant 4 to 8-foot-wide sidewalks and ramps, BOOST bus stops, a ped and bike bridge with a decorative metal cladding system over the Allen Parkway underpass, existing bridge modifications, a retaining wall (up to 8 feet in height), full traffic signal replacement at W Dallas Street, ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Houston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Government, Cement, Tunnel, Road, Commercial, Waste Processing and Treatment, Car parking, Bridge, Automotive

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project