Monument Fire Station #2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Interior reconfiguration of existing Monument Fire Station #2, including new CMU walls and footings inside the apparatus bay.Remodel of an existing fire station including selective demolition, wood frame construction, interior partitions, M/E/P, millwork, floorcoverings and paint. The entire project shall achieve Substantial Completion and be operational on or before March 12, 2025.
- Status
- Closed
- Sector
- Government, Manufacturing (Industrial), Commercial
- Location
- Monument, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Monument Fire Station 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior reconfiguration of existing Monument Fire Station #2, including new CMU walls and footings inside the apparatus bay.Remodel of an existing fire station including selective demolition, wood frame construction, interior partitions, M/E/P, millwork, floorcoverings and paint. The entire project shall achieve Substantial Completion and be operational on or before March 12, 2025. |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Monument |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
