Moon Forest Road Improvement and Culverts
Sector: Water Supply and Storage • Location: Helena, Montana, United States of America
Source: Dodge USA
DNRC is soliciting bids for the Gary C. Moon Forest Road Improvement and Project to complete the following (see attachment B for complete list): Clean bridge deck. Add rock at bridge approaches to fill in potholes. Construct new curve on the west side of the bridge to lowboy standards (75-foot turn radius). Place 50 slash filter windrow at Station C 2+00 of the existing road. Relocate road between
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial, Raw Materials
- Location
- Helena, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Moon Forest Road Improvement and Culverts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DNRC is soliciting bids for the Gary C. Moon Forest Road Improvement and Project to complete the following (see attachment B for complete list): Clean bridge deck. Add rock at bridge approaches to fill in potholes. Construct new curve on the west side of the bridge to lowboy standards (75-foot turn radius). Place 50 slash filter windrow at Station C 2+00 of the existing road. Relocate road between Station C Maintain drain dip and excavate Maintain drain dip, and relieve ditch across, and exca... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Helena |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial, Raw Materials |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
