Moonlight Desalination Plant
Sector: Water Supply and Storage • Location: Duba, Saudi Arabia
Source: Smart Water Magazine
The Moonlight desalination plant was planned to produce 150,000 cubic meters of desalinated water per day. It was intended to be located adjacent to a similar facility in Duba, on Saudi Arabia's Red Sea coast, and was set to take 12 months to complete. The project was tendered in 2024 with bids from several companies but was cancelled in 2026 as part of NEOM's restructuring efforts.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment
- Location
- Duba, Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Smart Water Magazine
ConstructChat
Ask ConstructChat about Moonlight Desalination Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Moonlight desalination plant was planned to produce 150,000 cubic meters of desalinated water per day. It was intended to be located adjacent to a similar facility in Duba, on Saudi Arabia's Red Sea coast, and was set to take 12 months to complete. The project was tendered in 2024 with bids from several companies but was cancelled in 2026 as part of NEOM's restructuring efforts. |
Original sector | Water |
Location
Country | Saudi Arabia |
City | Duba |
Source
Source | Smart Water Magazine |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-04-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
