Moore Crescent Sewage Pumping Station Renovations

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The objective of this project is primarily to complete upgrades at the Moore Crescent Sewage Pumping Station. This is to include upgrades to the existing incoming master control center (MCC) panels as well as replacement of the existing 20kW diesel generator and electric heater that have reached the end of their useful lives. The scope of work is to engage a consulting engineer to complete the det

Project Information FAQ

Project Information

5 Q
The project “Moore Crescent Sewage Pumping Station Renovations” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of this project is primarily to complete upgrades at the Moore Crescent Sewage Pumping Station. This is to include upgrades to the existing incoming master control center (MCC) panels as well as replacement of the existing 20kW diesel generator and electric heater that have reached the end of their useful lives. The scope of work is to engage a consulting engineer to complete the detailed design and associated tendering and construction administration tasks culminating in the selection of a contractor and the replacement of the existing MCC panels with variable frequency drives and associated controls. The MCC is to include a Programmable Logic Controller and Ethernet connections and be connected to the Town’s existing SCADA (Supervisory Control and Data Acquisition) system through an antenna or cell phone connection as appropriate. The work is also to include the replacement of the Miltronics level control unit and the addition of an electromagnetic flow meter in both pumping stations. The existing electric heating is to be replaced with a new system such as natural gas. The existing transfer switches are expected to be reused along with the existing dialers however a condition evaluation is to be completed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data