Moose Factory Sewage Lagoon Upgrade
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The sewage lagoon required to be dredged and cleaned to remove excessive sludge to meet the regulatory requirements of Total Suspended Solids (TSS), Biochemical oxygen demand (BOD), etc. The sewage lagoon system consistently fails to meet the effluent discharge criteria. The exceedances contribute to the adverse impact on the receiving water body. One of the main reason is that the lagoon system i
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Moose Factory Sewage Lagoon Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The sewage lagoon required to be dredged and cleaned to remove excessive sludge to meet the regulatory requirements of Total Suspended Solids (TSS), Biochemical oxygen demand (BOD), etc. The sewage lagoon system consistently fails to meet the effluent discharge criteria. The exceedances contribute to the adverse impact on the receiving water body. One of the main reason is that the lagoon system is full of sludge and cells must be cleaned to provide required treatment area. Successful completion of this project will ensure that untreated wastewater does not enter the environment and negatively impact surrounding communities. The removal works are capitalized as they extend the life of the asset. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
