MORANE-2 Project
Sector: Rail • Location: Various
Source: Stock Titan
The MORANE-2 project is a European initiative aimed at testing Future Railway Mobile Communication System (FRMCS) specifications. It involves the deployment of VIAVI's EVOIA Drive Test and EVOIA Assure solutions to monitor and validate FRMCS prototypes, which are set to replace the current GSM-R system by 2030. The project will run for 34 months from 2024 to 2027, focusing on establishing standard
- Status
- Prospective
- Sector
- Rail, Mass Transit
- Location
- Unknown (Europe)
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about MORANE-2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The MORANE-2 project is a European initiative aimed at testing Future Railway Mobile Communication System (FRMCS) specifications. It involves the deployment of VIAVI's EVOIA Drive Test and EVOIA Assure solutions to monitor and validate FRMCS prototypes, which are set to replace the current GSM-R system by 2030. The project will run for 34 months from 2024 to 2027, focusing on establishing standards for railway communications across Europe. |
Original sector | Railway Communications |
Location
Country | Unknown (Europe) |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Rail, Mass Transit |
Article published date | 2025-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
