MORAZAN DAM EMERGENC
Closed · Honduras
Source: World Bank Group
The Morazan Dam Emergency Project will: (a) maintain the structural integrity of the Morazan Dam; (b) increase the reliability of the power plant's auxiliary system; and (c) strengthen the National Power Company's (ENEE's) emergency preparedness planning and its capacity to monitor dam performance. The project comprises: (a) an underground investigation program with deep rock borings with corres
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Tunnel, Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MORAZAN DAM EMERGENC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Morazan Dam Emergency Project will: (a) maintain the structural integrity of the Morazan Dam; (b) increase the reliability of the power plant's auxiliary system; and (c) strengthen the National Power Company's (ENEE's) emergency preparedness planning and its capacity to monitor dam performance. The project comprises: (a) an underground investigation program with deep rock borings with corresponding instrumentation, followed by high pressure injection of sealants into the rock mass; (b) impermeabilization of the power plant sump, construction of about 300m of additional drainage galleries to evacuate filtrations by gravity flow, and plugging of the diversion tunnel; (c) installation of additional electrical and mechanical equipment to substantially increase service reliability of the auxiliary electrical system of the power plant; (d) supply and installation of new and complementary instrumentation to monitor foundation pressures and water filtrations; (e) consulting services to: (i) supervise the impermeabilization works; (ii) carry out a structural and electro-mechanical review of the dam; and (iii) prepare an emergency preparedness and evaluation plan; and (f) training of ENEE staff in underground investigations, pressure sealing of foundations, monitoring of hydrostatic foundation pressures and water leakages in high dams and electrical system stability. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Tunnel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
