Morena Pipeline Improvements REBID
Sector: Water Supply and Storage • Location: San Diego, California, United States of America
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Morena Pipeline: The Morena Pipeline project includes the removal and replacement of 16" cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36" Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipeline move north along Mor
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Government, Steel, Waste Processing and Treatment, Road, Commercial
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Morena Pipeline Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Morena Pipeline: The Morena Pipeline project includes the removal and replacement of 16" cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36" Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipeline move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Morena Boulevard Median... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Steel, Waste Processing and Treatment, Road, Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
