Morgan Park 2.1 Improvements
Sector: Cement • Location: Perris, California, United States of America
Source: Dodge USA
The Morgan Park 2.1 Improvements include site demolition, clearing and grubbing, earthwork and grading, site drainage, extending an existing 26' wide park access road, with a round-a-bout, solar access road lights and a pedestrian crosswalk with crosswalk warning lights. Installation of electrical vehicle charging station unit. Asphalt and concrete paving, concrete form work, concrete reinforcemen
- Status
- Closed
- Sector
- Cement, Government, Solar, Manufacturing (Industrial), Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking
- Location
- Perris, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Morgan Park 2.1 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Morgan Park 2.1 Improvements include site demolition, clearing and grubbing, earthwork and grading, site drainage, extending an existing 26' wide park access road, with a round-a-bout, solar access road lights and a pedestrian crosswalk with crosswalk warning lights. Installation of electrical vehicle charging station unit. Asphalt and concrete paving, concrete form work, concrete reinforcement, cast-in-place concrete, caulking and moisture protection. Expanding an existing parking lot wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Perris |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Solar, Manufacturing (Industrial), Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
