Morocco - Electricity Power Grid Interconnection Strengthening Project
Sector: Power Generation (CCGT) • Location: Morocco
Source: African Development Bank (AfDB)
The present intervention focuses on the project to reinforce electricity interconnections. More specifically, it aims to strengthen electricity interconnections with Algeria and Spain in order to diversify energy sources and meet a constant and sustained demand at affordable prices for economic development. The project thus responds to Morocco's strategy of diversifying its sources of electricity
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention focuses on the project to reinforce electricity interconnections. More specifically, it aims to strengthen electricity interconnections with Algeria and Spain in order to diversify energy sources and meet a constant and sustained demand at affordable prices for economic development. The project thus responds to Morocco's strategy of diversifying its sources of electricity supply, by using the natural gas transiting from Algeria to Spain, gradually developing its renewable energy potential, and increase the exchange of electrical energy. The main components of the project are: 1) the construction of 670 km of 400 kV THT and 60 km of 225 kV lines; 2) the installation of a second Morocco-Spain 400 kV submarine link; 3) the construction of 3 substations 400/225 kV and extension of a substation; 4) the strengthening and extension of the 225 kV and 60 kV network by the construction of 4 225/60 kV substations and 175 km of 220 kV lines; 5) the supply and installation of an optical fiber network on the existing THT and HT lines; 6) the implementation of mitigation measures for environmental impacts; and 7) the services of studies, supervision and control of works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
