logo

Morocco - Marrakech Region Water Supply Project

Sector: Manufacturing (Industrial) • Location: Morocco

Source: African Development Bank (AfDB)

Project

The Marrakech Region Water Supply Project in Morocco consists in ensuring the secure supply of drinking water to the city of Marrakech and its neighbouring urban centres from the Al Massira dam and meeting the industrial water needs of the country’s Phosphates Authority (Office chérifien de Phosphates – OCP). Its design was based on the priority needs outlined by ONEE (Water Branch) in its Program

Project Information FAQ

Project Information

4 Q
The project “Morocco - Marrakech Region Water Supply Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Marrakech Region Water Supply Project in Morocco consists in ensuring the secure supply of drinking water to the city of Marrakech and its neighbouring urban centres from the Al Massira dam and meeting the industrial water needs of the country’s Phosphates Authority (Office chérifien de Phosphates – OCP). Its design was based on the priority needs outlined by ONEE (Water Branch) in its Programme Contract with the Moroccan State for the 2012-2016 period. This area has three poles (Marrakech, Al Haouz and Al Kelaa) which are experiencing significant urban, tourism and industrial development. The project has the following components: (i) Development of water production, storage and supply infrastructure divided into two subcomponents: one part "water declogged" & another part dedicated to "treated water"; (ii) Technical support: Studies, control and supervision of works. The total cost is estimated at UA 212.1 million, with a 60-month period (2013-2017) planned for completion. This operation provides an opportunity for the Bank to foster its cooperation with a major water sector partner in Morocco, the French Development Agency, which participates in its financing.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data