Morocco - Noor Midelt Solar Central Project - Phase I

Sector: Oil and Gas • Location: Morocco

Source: African Development Bank (AfDB)

Project

The project is part of the deployment of the Moroccan Solar Programme (NOOR), which aims to develop a total power generating capacity of at least 2 000 MW by 2020. The first project under this programme was the Ouarzazate complex, with a total capacity of 580 MW, spread over four plants. The first plant (160 MW) was commissioned in January 2016 and the others will go operational in 2018. Two othe

Project Information FAQ

Project Information

4 Q
The project “Morocco - Noor Midelt Solar Central Project - Phase I” is an infrastructure initiative in the Oil and Gas sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is part of the deployment of the Moroccan Solar Programme (NOOR), which aims to develop a total power generating capacity of at least 2 000 MW by 2020. The first project under this programme was the Ouarzazate complex, with a total capacity of 580 MW, spread over four plants. The first plant (160 MW) was commissioned in January 2016 and the others will go operational in 2018. Two other sites totalling100 MW are currently being developed and will be commissioned in 2018. The project before the Board aims to developtwo solar power plants (NOORMI and NOORMII) with a cumulative capacity of up to 800 MW, under a public-private partnership (PPP). Theplants will be connected to the national grid and will have a total annual output estimated at 1 886 GWh, thus guaranteeing electricity supplyfor more than 2 million Moroccans (almost 6% of the total population) and helping to avoid the release into the atmosphere of greenhouse gases equivalent to 0.7 million tonnes of CO2per year. The project will help to improve the security of power supply in Morocco (whereelectricity is used by 99% of the population). It will be implemented by MASEN based on the same mechanisms put in place for previous projects (NOOR Ouarzazate Solar Complex -Phases I & II), which were financed by the same donors (including the Bank) and whose performance in terms of implementation is deemed satisfactory. The total cost of the project is estimated at EUR 2 048 million. The donors involved in itsfinancing are, in addition to the Bank and the CTF, AFD, WB, EIB, KFW and NIF/EU. The project will be implemented over 48 months (2018-2021).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data