The Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) is an investment operation. It aims to improve the safety and efficiency of electricity supply in a sustainable development framework. The programme covers the construction and extension of: (i) power lines and substations (VHV and HV) to address current energy transmission constraints and ensure the evacuati

Project Information FAQ

Project Information

4 Q
The project “Morocco - Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER)” is an infrastructure initiative in the Wind sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Power Transmission Network Development and Rural Electrification Programme (PDRTE-ER) is an investment operation. It aims to improve the safety and efficiency of electricity supply in a sustainable development framework. The programme covers the construction and extension of: (i) power lines and substations (VHV and HV) to address current energy transmission constraints and ensure the evacuation of electricity to be generated through the development of additional production capacity, including renewable sources (solar and wind) and power grids (MV/LV) to provide widespread access to power in Moroccan rural areas. It will help to extend the interconnected grid and increase its transmission capacity, ensuring that the energy produced by solar and wind power plants under development or planned for 2020 can be evacuated. In addition, the PDRTE-ER contribute to the strong penetration of renewable and clean energy in the national energy mix, thus mitigating the effects of power generation on climate change, enabling Morocco to meet its national and international commitments in this area. The total cost of the programme is estimated at EUR 352.33 million. It will be carried out over five (5) years from 2020 to 2024. It comprises three components detailed below: (A) Power transmission; (B) Rural electrification; (C) Programme management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data