logo

Morocco - Railway Rehabilitation Project

Sector: Residential • Location: Morocco

Source: African Development Bank (AfDB)

Project

The railway rehabilitation project is part of the overall transport sector aiming to ensure an optimal distribution of inter-regional trade in Morocco. The railways transport phosphates, which are Morocco's main export product and the main source of foreign exchange for the economy. The restructuring of ONCF, by creating the conditions for efficient and reliable transport, contributes to the promo

Project Information FAQ

Project Information

4 Q
The project “Morocco - Railway Rehabilitation Project” is an infrastructure initiative in the Residential sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The railway rehabilitation project is part of the overall transport sector aiming to ensure an optimal distribution of inter-regional trade in Morocco. The railways transport phosphates, which are Morocco's main export product and the main source of foreign exchange for the economy. The restructuring of ONCF, by creating the conditions for efficient and reliable transport, contributes to the promotion of exports and the competitiveness of Moroccan phosphate production. The investment as conceived will reduce the economic incidents and losses suffered by the railway operator and will generate significant added value for the national economy. All components of the project will be implemented over 60 months; the ADB component of the project will run for 48 months from loan approval by the Bank.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data