logo

Morocco - Renewal of Electricity Transmission and Supply Networks Project

Sector: Residential • Location: Morocco

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Renewal of Electricity Transmission and Supply Networks Project. The project aims to improve electricity supply conditions in terms of continuity and quality of service of the transmission and distribution networks in the Northwest, Central, Tensift and South regions. This is in order to adapt them to the new load and reliability constraints by reducing, from

Project Information FAQ

Project Information

4 Q
The project “Morocco - Renewal of Electricity Transmission and Supply Networks Project” is an infrastructure initiative in the Residential sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Renewal of Electricity Transmission and Supply Networks Project. The project aims to improve electricity supply conditions in terms of continuity and quality of service of the transmission and distribution networks in the Northwest, Central, Tensift and South regions. This is in order to adapt them to the new load and reliability constraints by reducing, from 2000, the average annual shutdown time (from 67 h/year in 1996 to 10 h/year in 2000) and technical losses (from 10.8% in 1986 to 6 to 7% in 2000) and by strengthening the safety of network equipment and people. The project comprises five main components, namely: (A) 60 kV lines; (B) 60 kV Sub-stations; (C) passage in 225 kV of three (3) 150 kV feeders; (D) Improvement of protection in the VHV/HV and (E) Engineering studies and works supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data