Morocco - Renewal of Electricity Transmission and Supply Networks Project
Sector: Residential • Location: Morocco
Source: African Development Bank (AfDB)
The present intervention concerns the Renewal of Electricity Transmission and Supply Networks Project. The project aims to improve electricity supply conditions in terms of continuity and quality of service of the transmission and distribution networks in the Northwest, Central, Tensift and South regions. This is in order to adapt them to the new load and reliability constraints by reducing, from
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention concerns the Renewal of Electricity Transmission and Supply Networks Project. The project aims to improve electricity supply conditions in terms of continuity and quality of service of the transmission and distribution networks in the Northwest, Central, Tensift and South regions. This is in order to adapt them to the new load and reliability constraints by reducing, from 2000, the average annual shutdown time (from 67 h/year in 1996 to 10 h/year in 2000) and technical losses (from 10.8% in 1986 to 6 to 7% in 2000) and by strengthening the safety of network equipment and people. The project comprises five main components, namely: (A) 60 kV lines; (B) 60 kV Sub-stations; (C) passage in 225 kV of three (3) 150 kV feeders; (D) Improvement of protection in the VHV/HV and (E) Engineering studies and works supervision. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
