Morrison 2025 Hill Road Culvert Replacements
Sector: Water Supply and Storage • Location: Greenleaf, Wisconsin, United States of America
Source: Dodge
In general, the project consists of replacement of multiple cross culverts on Hill Road in the Town of Morrison from CTH W to River Road. The work includes but is not limited to 8 culvert replacements ranging from 24" to 43"x 64" in diameter, gravel backfill, asphalt patching, erosion control, and related items.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government
- Location
- Greenleaf, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Morrison 2025 Hill Road Culvert Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the project consists of replacement of multiple cross culverts on Hill Road in the Town of Morrison from CTH W to River Road. The work includes but is not limited to 8 culvert replacements ranging from 24" to 43"x 64" in diameter, gravel backfill, asphalt patching, erosion control, and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Greenleaf |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
