Morro do Chapeu Sul Wind Farm

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

The Italian company Enel Green Power was granted the authorization to build six wind power plants located in the state of Bahia, municipality of Morro do Chapéu (172 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2015.

The company created four special purpose companies to manage the projects:

Enel Green Power Morro Do Chapeu II Eolica

Status
Prospective
Sector
Steel, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Morro do Chapeu Sul Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Morro do Chapeu Sul Wind Farm” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Italian company Enel Green Power was granted the authorization to build six wind power plants located in the state of Bahia, municipality of Morro do Chapéu (172 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2015. The company created four special purpose companies to manage the projects: Enel Green Power Morro Do Chapeu II Eolica S.A.: EOL Ventos de Santa Esperanca (28 MW), EOL Ventos de Santa Dulce (28 MW) Enel Green Power Morro Do Chapeu I Eolica S.A.: EOL Ventos de Sao Mario (30 MW), EOL Ventos do Sao Paulo (28 MW) Enel Green Power Sao Abraao Eolica S.A.: EOL Ventos de Sao Abraao (28 MW) Enel Green Power Boa Vista Eolica S.A.: EOL Boa Vista da Lagoinha (30 MW) The total investment in the power plants was estimated at US$ 380 million, financed with the sponsor's equity. Construction works commenced in September 2016 and are expected to be concluded by 2018. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. EOL Ventos de Esperanca, EOL Ventos de Santa Dulce, EOL Ventos de Sao Mario and EOL Ventos de Sao Paulo won the public bidding that took place in November 2014 by offering an average tariff of US$ 57.7/MWh (BRL 135.69/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. The other two power plants (EOL Ventos de Sao Abraao and EOL Boa Vista) signed 20-year PPA (Power Purchase Agreement) in the spot market. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project