Morse Merryman New Sanitary Sewer Lift Station
Pre-design · Washington · Last reported Apr 2024
Source: Dodge USA
New sanitary sewer lift station. Work to include water main extension, and sewer main extension throughout the drainage basin. Initial construction to include gravity sewer and water service to properties along Wiggins Rd., Hoffman Ct, and Morse Merryman Rd. Sewer and water connections will connect to existing lines in Boulevard Rd.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Olympia, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Morse Merryman New Sanitary Sewer Lift Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New sanitary sewer lift station. Work to include water main extension, and sewer main extension throughout the drainage basin. Initial construction to include gravity sewer and water service to properties along Wiggins Rd., Hoffman Ct, and Morse Merryman Rd. Sewer and water connections will connect to existing lines in Boulevard Rd. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Olympia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
