logo

Moscow Urban Transport Project

Sector: Mass Transit • Location: Russian Federation

Source: World Bank Group

Project
Closed

The Moscow Urban Transport Project aims at improving institutional capacity in planning, implementing, operating, and enforcing traffic management measures, to improve transport mobility in the city. The components will: 1) finance the establishment of a traffic management center (TMS), responsible for planning traffic management schemes, including the operation of traffic signals. Technical assis

Project Information FAQ

Project Information

5 Q
The project “Moscow Urban Transport Project” is an infrastructure initiative in the Mass Transit sector, located in Russian Federation. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Moscow Urban Transport Project aims at improving institutional capacity in planning, implementing, operating, and enforcing traffic management measures, to improve transport mobility in the city. The components will: 1) finance the establishment of a traffic management center (TMS), responsible for planning traffic management schemes, including the operation of traffic signals. Technical assistance, and training will be provided to support implementation by the TMS, of traffic monitoring programs, and studies on traffic control, and parking availability; 2) include a comprehensive range of traffic, and safety enhancing improvements along two corridors, radiating from the Garden Ring, to the Outer Ring Road encircling Moscow, including an additional corridor to be determined; 3) finalize completion of feasibility studies for the Garden Ring/Central Area, begun during project preparation. Upon approval, completion of detailed engineering schemes along the above mentioned area, will be financed; 4) widen the Donbasky Bridge, to accommodate an eight lane roadway on either side of the bridge, and, eliminate the existing tram track bridge; and, 5) conduct a traffic enforcement program, ensuring adequate training to staff, and implementation of operational plans to maximize equipment, construction, and advisory investments.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data