Moscow Urban Transport Project
Sector: Mass Transit • Location: Russian Federation
Source: World Bank Group
The Moscow Urban Transport Project aims at improving institutional capacity in planning, implementing, operating, and enforcing traffic management measures, to improve transport mobility in the city. The components will: 1) finance the establishment of a traffic management center (TMS), responsible for planning traffic management schemes, including the operation of traffic signals. Technical assis
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Moscow Urban Transport Project aims at improving institutional capacity in planning, implementing, operating, and enforcing traffic management measures, to improve transport mobility in the city. The components will: 1) finance the establishment of a traffic management center (TMS), responsible for planning traffic management schemes, including the operation of traffic signals. Technical assistance, and training will be provided to support implementation by the TMS, of traffic monitoring programs, and studies on traffic control, and parking availability; 2) include a comprehensive range of traffic, and safety enhancing improvements along two corridors, radiating from the Garden Ring, to the Outer Ring Road encircling Moscow, including an additional corridor to be determined; 3) finalize completion of feasibility studies for the Garden Ring/Central Area, begun during project preparation. Upon approval, completion of detailed engineering schemes along the above mentioned area, will be financed; 4) widen the Donbasky Bridge, to accommodate an eight lane roadway on either side of the bridge, and, eliminate the existing tram track bridge; and, 5) conduct a traffic enforcement program, ensuring adequate training to staff, and implementation of operational plans to maximize equipment, construction, and advisory investments. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
