Financing of Mosenergo’s urgent priority investments for the refurbishment of several combines heat and power plants (“CHPs”) to improve the efficiency of operations. Up to USD 50 million RUB equivalent will also be used to finance optimization of the balance sheet (refinancing of short-term debt). The transition impact of the loan derives from the following: Mosenergo Open Joint Stock Company (Mo

Project Information FAQ

Project Information

3 Q
The project “Mosenergo Post Restructuring Loan” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Financing of Mosenergo’s urgent priority investments for the refurbishment of several combines heat and power plants (“CHPs”) to improve the efficiency of operations. Up to USD 50 million RUB equivalent will also be used to finance optimization of the balance sheet (refinancing of short-term debt). The transition impact of the loan derives from the following: Mosenergo Open Joint Stock Company (Mosenergo or the Company), a generation company that serves Moscow and the Moscow region and is a post-restructuring successor to a vertically integrated Moscow regional power utility. Mosenergo holds a B- long-term corporate rating with stable outlook from Standard & Poor’s. The Bank will underwrite up to USD 250 Million rouble equivalent (the Loan), consisting of: a. Tranche A in the amount of USD 100 Million rouble equivalent for the Bank's own account; and b. Tranche B to be syndicated in the amount of USD 150 million rouble equivalent. Up to EUR 1.24 billion. Environmental classification and rationale The project was screened B/1, requiring an Environmental Audit and Environmental Analysis in line with the Bank's Environmental Policy and Public Information Policy. The modernization of existing power units focusing mainly on improvising energy efficiency and operational control is associated with a number of environmental issues, which can be readily identified, assessed and mitigated as part of an Environmental Analysis. An Environmental Audit and Analysis was undertaken by an independent consultant. Key environmental issues and mitigation The key environmental issues are air emissions (i.e. NOx) from the mainly gas fired units (92% of used fuel is gas). As a result of ongoing investment programmes the Company has achieved significant NOx emission reductions with emission down from 151 kT in 1993 to 67 kT in 2004. The investment programme will further reduce emissions by 2010. It should be noted that the share of the power utilities is approximately 5% of all emission in the atmosphere of the Moscow area. Overall emissions from the plant are not judged as a having a significant adverse impact due to the nature of fuel mix, a lot of environmental measures and sites location. The planned modernization will also upgrade existing boilers inclusive of the existing primary NOx control systems and the installation of low NOx burners. The plants are subject to regulatory control and all plants have valid permits. Russian air quality standards, notably for SO2 and NOx are substantially more stringent than comparable European Union standards. The investment programme is aimed at ensuring compliance with Russian air quality standards and is structured to meet EU environmental standards. The Company will undertake a Best Available Techniques (BAT) assessment of operations in the future to further assess investment needs. Greenhouse gas (GHG) emissions are currently around 50 mln t/yr. A GHG strategy will be developed in the future as part of the EMS to take account of the planned increase in the demand of electricity in the Moscow region. Water use is a significant aspect of the plants operations. The planned investment programme aims to improve quality and reduce quantity of sewage from the plants. The operations are not associated with significant waste disposal problems due to the nature of the fuel used. However, some hazardous and non hazardous waste needs to be located and utilized in licensed landfills. As part of developing a formalised environmental management system this will be addressed to reduce environmental and human risk. Contaminated land control regularly take place according to the schedule by means of observations and analysis of groundwater from the net of piezometric stations at the CHPs. Asbestos containing materials are not used at the plants now, but exist at some non-refurbished equipment and the investment programme will include the development of an asbestos management plan to address this issue. Part of the investment programme is aimed at introduced a formalised environmental, health and safety management system and continuous monitoring at all 17 plants is to be undertaken by 2012. This will allow for further strengthening of the current environmental, health and safety management system at the Company in line with best international practice. Environmental opportunities The proposed project is expected to bring significant environmental benefits as the upgraded plant will have a higher overall efficiency and substantial improvement will be made to the environmental management and operation of the plant. Future investments may result in the potential for JI and CDM projects. Summary of Environmental Action Plan The company will be required to adhere to Russian environmental, health and safety regulations and EU environmental standards. All relevant permits will need to be obtained during the modernization period. An Environmental Action Plan (EAP) has been developed and agreed with the Company based on the results of due diligence. The EAP will address, inter alia, air emission control; need for continuous air monitoring systems; asbestos management; house keeping, and the overall management of the environment, health and safety issues at the power plant and associated auxiliary operations. An environmental management system incorporating all operational units will be developed by 2012. The following upgrades are planned: Disclosure of information and consultation In the context of the EBRD's participation in the project, the Company has released locally a summary of relevant environmental issues associated with the project and summarise mitigation measures, action plans and other initiatives agreed. Monitoring and reporting The Company will continue to monitor the environmental impact of its operations in accordance with national law and regulations. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports prepared for the project. This will include: (i) ongoing performance of project-specific environmental, health and safety activities as reflected in the results of periodic and quantitative sampling and measuring programmes, and (ii) the status of implementation of environmental mitigation and improvement measures. The Bank's representatives will also conduct periodic site supervision visits when deemed appropriate. If required, the Bank will carry out monitoring visits to the Company. Technical Assistance will be sought to facilitate development of heat law. Dmitry V. Vasiliev First Deputy General Director for Strategy and Corporate Policy Mosenergo Open Joint Stock Company (AO Mosenergo) 8, Raulskaya Naberezhnaya St. Moscow 115035 Russia

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data