Moser Baer Solitaire Solar Plant
Sector: Automotive • Location: India
Source: World Bank Group
In January 2009, Solitaire Energies Private Limited (SEPL) a Special Purpose Vehicle (SPV) of Moser Baer Clean Energy Limited (MBCEL), signed an MoU with Gujarat Energy Development Agency (GEDA) for setting up a 15-mw photovoltaic solar power plant at Guthawada (Dalpatpura), Taluk Kankarej, District Banaskantha,in Gujarat, under the Gujarat Solar Policy 2009. The proposed project would use thin fi
- Status
- Prospective
- Sector
- Automotive, Commercial, Power Generation (CCGT), Solar, Power Transmission, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Moser Baer Solitaire Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 2009, Solitaire Energies Private Limited (SEPL) a Special Purpose Vehicle (SPV) of Moser Baer Clean Energy Limited (MBCEL), signed an MoU with Gujarat Energy Development Agency (GEDA) for setting up a 15-mw photovoltaic solar power plant at Guthawada (Dalpatpura), Taluk Kankarej, District Banaskantha,in Gujarat, under the Gujarat Solar Policy 2009. The proposed project would use thin film technology. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. Power evacuation was planned through an 8 Km 66 KV line, which, as per the state policy, was the responsibility of Gujarat Energy Transmission Corporation Limited (GETCO). SEPL had entered into a 25-year Power Purchase Agreement with the state utility Gujarat Urja Vikas Nigam Limited (GUVNL),which would be effected at the time of commissioning of the project. The APPC (Average Power Purchase Cost) as per the Gujarat Solar Policy 2009, was US$ 0.32/Unit (INR 15 per unit @ 47INR/USD) for the first 12 years, and US$ 0.11/Unit (INR 5 per unit @47 INR/USD) from 13th year to 25th year.The total capacity of 15 MW was eligible for carbon credits. Proceeds of carbon credit were to be shared as follows: (a) 100% by project developer in the first year after the date of commercial operation of the generating station/ transmission system; (b) 2nd year – share of beneficiaries (DISCOM-GUVNL) @ 10% to progressively increase by 10% every year up to 50% whereafter the proceeds would be shared in equal proportion, by SEPL and GUVNL. Transmission and/or wheeling charges would be paid by SEPL. Financial closure took place in August 2011.The total project cost was US$ 49.5mn (INR 2325.4mn @47 INR/USD).The debt equity ratio for the project was 70/30. The financing comprised of sponsor equity of US$14.8mn (INR 697.6mn) and debt of US$ 34.6mn (INR 1627.8mn).The 13-year 6-months term loan had a repayment schedule of 48 quarterly instalments. The loan was solely arranged by Bank of Baroda.The Asian Development Bank (ADB) also provided a Partial Credit Guarante (PCG) for the project. The project was commissioned in 2011. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Power Generation (CCGT), Solar, Power Transmission, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in India
- Mundra Ultra Mega Power Plant Gujarat
- Dholera Solar Park Gujarat
- ONGC Tripura Power Plant
- Tuppadahalli Wind Farm
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
