logo

Moser Baer Solitaire Solar Plant

Sector: Automotive • Location: India

Source: World Bank Group

Project
Active

In January 2009, Solitaire Energies Private Limited (SEPL) a Special Purpose Vehicle (SPV) of Moser Baer Clean Energy Limited (MBCEL), signed an MoU with Gujarat Energy Development Agency (GEDA) for setting up a 15-mw photovoltaic solar power plant at Guthawada (Dalpatpura), Taluk Kankarej, District Banaskantha,in Gujarat, under the Gujarat Solar Policy 2009. The proposed project would use thin fi

Status
Prospective
Sector
Automotive, Commercial, Power Generation (CCGT), Solar, Power Transmission, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Moser Baer Solitaire Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Moser Baer Solitaire Solar Plant” is an infrastructure initiative in the Automotive sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In January 2009, Solitaire Energies Private Limited (SEPL) a Special Purpose Vehicle (SPV) of Moser Baer Clean Energy Limited (MBCEL), signed an MoU with Gujarat Energy Development Agency (GEDA) for setting up a 15-mw photovoltaic solar power plant at Guthawada (Dalpatpura), Taluk Kankarej, District Banaskantha,in Gujarat, under the Gujarat Solar Policy 2009. The proposed project would use thin film technology. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. Power evacuation was planned through an 8 Km 66 KV line, which, as per the state policy, was the responsibility of Gujarat Energy Transmission Corporation Limited (GETCO). SEPL had entered into a 25-year Power Purchase Agreement with the state utility Gujarat Urja Vikas Nigam Limited (GUVNL),which would be effected at the time of commissioning of the project. The APPC (Average Power Purchase Cost) as per the Gujarat Solar Policy 2009, was US$ 0.32/Unit (INR 15 per unit @ 47INR/USD) for the first 12 years, and US$ 0.11/Unit (INR 5 per unit @47 INR/USD) from 13th year to 25th year.The total capacity of 15 MW was eligible for carbon credits. Proceeds of carbon credit were to be shared as follows: (a) 100% by project developer in the first year after the date of commercial operation of the generating station/ transmission system; (b) 2nd year – share of beneficiaries (DISCOM-GUVNL) @ 10% to progressively increase by 10% every year up to 50% whereafter the proceeds would be shared in equal proportion, by SEPL and GUVNL. Transmission and/or wheeling charges would be paid by SEPL. Financial closure took place in August 2011.The total project cost was US$ 49.5mn (INR 2325.4mn @47 INR/USD).The debt equity ratio for the project was 70/30. The financing comprised of sponsor equity of US$14.8mn (INR 697.6mn) and debt of US$ 34.6mn (INR 1627.8mn).The 13-year 6-months term loan had a repayment schedule of 48 quarterly instalments. The loan was solely arranged by Bank of Baroda.The Asian Development Bank (ADB) also provided a Partial Credit Guarante (PCG) for the project. The project was commissioned in 2011.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Commercial, Power Generation (CCGT), Solar, Power Transmission, Government

Article published date

2024-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project