Moser Highlands Water Main Improvements
Sector: Water Supply and Storage • Location: Naperville, Illinois, United States of America
Source: Dodge USA
This project will replace the existing 6" water main with 8" water main on the following streets: Tupelo from Modaff to Laurel, Osage from Basswood to Laurel, Rowan Court, Tamarack from Basswood to Laurel, Tanoak from Basswood to Olympus, Laurel from Tanoak to Gartner, Basswood from Tupelo to Catalpa, Triton from Basswood to Olympus, Catalpa from Gartner to Triton, Naper Plaza Rear from Washington
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government
- Location
- Naperville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Moser Highlands Water Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace the existing 6" water main with 8" water main on the following streets: Tupelo from Modaff to Laurel, Osage from Basswood to Laurel, Rowan Court, Tamarack from Basswood to Laurel, Tanoak from Basswood to Olympus, Laurel from Tanoak to Gartner, Basswood from Tupelo to Catalpa, Triton from Basswood to Olympus, Catalpa from Gartner to Triton, Naper Plaza Rear from Washington to Triton. The total water main to be replaced within this project is 2.05 miles The City of Nap... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Naperville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
