logo

Mostar North to Mostar South Motorway

Sector: Electric Vehicles (EVs) • Location: Bosnia and Herzegovina

Source: European Bank for Reconstruction and Development (EBRD)

Project
Disbursing

A sovereign loan to BiH (the “Borrower”) of up to EUR 50 million, divided into 2 tranches of up to EUR 25 million each (the “Project”). The loan will be on lent via the Federation of Bosnia and Herzegovina (“FBH”) to the Motorways of the Federation of Bosnia and Herzegovina (“FBHM”). Local commercial banks will provide parallel loans of up to EUR 150 million also in 2 tranches. The first tranche w

Project Information FAQ

Project Information

4 Q
The project “Mostar North to Mostar South Motorway” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

disbursing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A sovereign loan to BiH (the “Borrower”) of up to EUR 50 million, divided into 2 tranches of up to EUR 25 million each (the “Project”). The loan will be on lent via the Federation of Bosnia and Herzegovina (“FBH”) to the Motorways of the Federation of Bosnia and Herzegovina (“FBHM”). Local commercial banks will provide parallel loans of up to EUR 150 million also in 2 tranches. The first tranche will be committed on signing. The proceeds of the loans will be used for the construction of a 15.4 km long section of Corridor Vc between Mostar North and Mostar South interchanges. This section is to be built to full motorway standard with a dual carriageway. The preliminary design envisages a total of 8 km of tunnels and just under 1 km of bridges and viaducts for the entire section. The Project will improve the road infrastructure and services in and around the city of Mostar by facilitating the flow of people and goods through Mostar. The project will also contribute to improving resilience to climate change, through adaption of relevant measures into the design. It will also address possible mitigation effect of the Project related to relevant Paris Agreement obligations, notably impact on GHG emissions through the diversion of induced and diverted traffic, as well as impact on local air pollution. Additional climate mitigation efforts are expected from gradual introduction of free pass electronic toll collection (“ETC”) system and implementation of EV charging infrastructure. The following documents are available in English and local language: Download zip file of complete package: English | Local language Land Acquisition and Resettlement Plan for the Mostar North–Mostar South: English | Bosnian Full ESIA documentation is available locally at: Motorways of FBiH d.o.o., Sarajevo Office Hamdije Kresevljakovica 19, 71000 Sarajevo Contact person: Amir Fejzic, Head of Environmental and Social Team, Tel. +387 33 277 956 And Motorways of  FBiH d.o.o. Mostar Adema Buca 20, 88 000 Mostar Contact person: Marijana Prkačin Goluža, Senior Assistant for Studies and Design Tel. +387 36 512 352 And Mostar City Administration Hrvatskih Branitelja 2, 88000 Mostar And EBRD, BiH 15th Floor, Tower B Unitic Towers Fra Andela Zvizdovica 1, 71000 Sarajevo Contact person: Josip Polic, Senior Banker Tel. +387 33 257 900 Mob. +387 61 139 370 Email: Policj@ebrd.com  Office opening hours are between 09:00 until 17.00 on weekdays. Due to COVID related restrictions, the office is only partially occupied. Please call the above mentioned telephone numbers to check the availability before visiting the Office.  During the active consultation period, the Client has disclosed the ESIA package in both the local and English language on the following website: Local language: http://www.jpautoceste.ba/dokumentacija-prema-zahtjevima-evropske-banke-za-obnovu-i-razvitak-ebrd/ Local language: http://www.jpautoceste.ba/en/documentation-regarding-the-requirements-of-european-bank-for-reconstruction-and-development-ebrd/ Environmental or social enquiries Attention: Amir Fejzic Head of Environmental and Social Team tel. 00387 33 277 956 Motorways of FBiH Postal Address: Hamdije Kresevljakovica 19, 71000 Sarajevo Telephone: +387 33 277 956 E-mail address: info@jpautoceste.ba www.jpautoceste.ba General enquiries Attention: Orhan Pasalic Secretary of the Motorways of FBIH Motorways of FBiH Postal Address: Hamdije Kresevljakovica 19, 71000 Sarajevo Telephone: +387 33 277 900 E-mail address: info@jpautoceste.ba www.jpautoceste.ba

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data