logo

Mother Mathilda Beasley Park ADA Ramp Replacement

Sector: Commercial • Location: Savannah, Georgia, United States of America

Source: Dodge USA

Project
Closed

The ramp utilized from within Mother Mathilda Beasley Park to the pavilion is in need of full replacement. The deck boards are rotten as well as the supports are no longer salvageable. The current wooden ramp shall be removed and replaced with a steel frame boardwalk by Wickcraft Boardwalks or equivalent. Mother Mathilda Beasley Park is located at 500 East Broad Street, Savannah, Georgia 31401.

Status
Closed
Sector
Commercial, Road, Government, Steel, Metal, Power Transmission, Car parking, Power Generation (CCGT), Automotive
Location
Savannah, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mother Mathilda Beasley Park ADA Ramp Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mother Mathilda Beasley Park ADA Ramp Replacement” is an infrastructure initiative in the Commercial sector, located in Savannah, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The ramp utilized from within Mother Mathilda Beasley Park to the pavilion is in need of full replacement. The deck boards are rotten as well as the supports are no longer salvageable. The current wooden ramp shall be removed and replaced with a steel frame boardwalk by Wickcraft Boardwalks or equivalent. Mother Mathilda Beasley Park is located at 500 East Broad Street, Savannah, Georgia 31401.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Savannah

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Road, Government, Steel, Metal, Power Transmission, Car parking, Power Generation (CCGT), Automotive

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project