Motherlode Force Main Replacement Program
Sector: Water Supply and Storage • Location: Placerville, California, United States of America
Source: Dodge USA
The Motherlode force main (MLFM) was originally constructed in 1977 and conveys wastewater from the El Dorado lift station approximately nine miles west to the Deer Creek Wastewater Treatment Plant. Six additional lift stations pump directly into the force main as well as several private lift stations. The MLFM was originally constructed with 12-inch asbestos cement pipe and has several peaks and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Motherlode force main (MLFM) was originally constructed in 1977 and conveys wastewater from the El Dorado lift station approximately nine miles west to the Deer Creek Wastewater Treatment Plant. Six additional lift stations pump directly into the force main as well as several private lift stations. The MLFM was originally constructed with 12-inch asbestos cement pipe and has several peaks and valleys as it progresses through the terrain. As wastewater is pumped over the peaks in the force... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
